interaktivierung.net
DE
All entries
2022 · 2015-2022 · Core dossier

HYDROGRID and Dalane Kraft: telemetry changes gate and dispatch plans

Mechanism and classification

Reservoir and inflow telemetry, market information and constraints → updated generation and gate-opening plan for KraftSCADA. Interpret this mechanism at the stated maturity level. A launch, demonstration or reference blueprint does not establish widespread operation or commercial success.

Editorial scope

The status describes the documented stage of the model; it is not a claim of market penetration or commercial success. Provider metrics remain provider claims unless independently confirmed.

Evidence

Complete research dossier

The complete editorial record — including the case-specific mechanism, chronology, limitations and cross-references — is maintained in German. Use the DE switch to open the exact counterpart.

Open the German dossier →

Mechanism and limits

The Haukland case links planning to Dalane Kraft’s control system. New telemetry informs subsequent generation and gate instructions rather than only changing a dashboard.

Provider case material and the UNIDO compilation share project evidence. The separate Voith pilot does not independently verify the same event. General profit, compliance and safety guarantees are not established.

Dates and evidence scope
Recorded event / reference date
2022-10-25 (dokumentiertes Betriebsbeispiel); keine Datierung des Erststarts
Atlas first publication
2026-11-15
Source review in this audit
2026-11-15

The editorial update date is not a claim that every source or current product feature was rechecked. Unknown dates remain open. Source publication dates are listed with the evidence above.

Structured evidence and geography register · Unclassified source roles and unassigned origin/market fields are explicitly marked.

Compare and read on

Editorial reading paths connect mechanisms; maturity and evidence remain case-specific.

All mechanisms and reading paths