interaktivierung.net
DE
All entries
2026 · since 2023 · Core dossier

AMPECO and Wattif: grid signals change charging power

Mechanism and classification

Grid signal, available circuit capacity and priority rule → changed power allocation across charging points. Interpret this mechanism at the stated maturity level. A launch, demonstration or reference blueprint does not establish widespread operation or commercial success.

Editorial scope

The status describes the documented stage of the model; it is not a claim of market penetration or commercial success. Provider metrics remain provider claims unless independently confirmed.

Evidence

Complete research dossier

The complete editorial record — including the case-specific mechanism, chronology, limitations and cross-references — is maintained in German. Use the DE switch to open the exact counterpart.

Open the German dossier →

Mechanism and limits

The Wattif account describes load shifting through Flexibility Assets and Dynamic Load Management. Technical documentation explains circuit limits and prioritised allocation; these are operational effects rather than dashboard-only information.

The case study and function documentation are provider-controlled; Wattif’s brochure separately confirms the software relationship. No universal hardware compatibility, market participation, savings or grid benefit is inferred.

Dates and evidence scope
Recorded event / reference date
2026 (Dokumentations-/Prüfjahr; erster Pilotbeginn offen)
Atlas first publication
2026-11-15
Source review in this audit
2026-11-15

The editorial update date is not a claim that every source or current product feature was rechecked. Unknown dates remain open. Source publication dates are listed with the evidence above.

Structured evidence and geography register · Unclassified source roles and unassigned origin/market fields are explicitly marked.

Compare and read on

Editorial reading paths connect mechanisms; maturity and evidence remain case-specific.

All mechanisms and reading paths