AMPECO and Wattif: grid signals change charging power
Mechanism and classification
Grid signal, available circuit capacity and priority rule → changed power allocation across charging points. Interpret this mechanism at the stated maturity level. A launch, demonstration or reference blueprint does not establish widespread operation or commercial success.
Editorial scope
The status describes the documented stage of the model; it is not a claim of market penetration or commercial success. Provider metrics remain provider claims unless independently confirmed.
Evidence
- Source 1 · ampeco.com ↗Undated; geprüft 15.11.2026
- Source 2 · independence must be assessed separately · ampeco.com ↗Undated; geprüft 15.11.2026
Complete research dossier
The complete editorial record — including the case-specific mechanism, chronology, limitations and cross-references — is maintained in German. Use the DE switch to open the exact counterpart.
Mechanism and limits
The Wattif account describes load shifting through Flexibility Assets and Dynamic Load Management. Technical documentation explains circuit limits and prioritised allocation; these are operational effects rather than dashboard-only information.
The case study and function documentation are provider-controlled; Wattif’s brochure separately confirms the software relationship. No universal hardware compatibility, market participation, savings or grid benefit is inferred.
In the EU Frontier provider index
AMPECO is listed by EU Frontier as a company. This directory reference adds provider identity context; it is not additional evidence of impact or operation for this Atlas entry.
Dates and evidence scope
- Recorded event / reference date
- 2026 (Dokumentations-/Prüfjahr; erster Pilotbeginn offen)
- Atlas first publication
- 2026-11-15
- Source review in this audit
- 2026-11-15
The editorial update date is not a claim that every source or current product feature was rechecked. Unknown dates remain open. Source publication dates are listed with the evidence above.
Structured evidence and geography register · Unclassified source roles and unassigned origin/market fields are explicitly marked.