EME at Schiphol: material passports and reservations
Mechanism and classification
Identified surplus material, availability and project reservation → reassignment to a construction project. Interpret this mechanism at the stated maturity level. A launch, demonstration or reference blueprint does not establish widespread operation or commercial success.
Editorial scope
The status describes the documented stage of the model; it is not a claim of market penetration or commercial success. Provider metrics remain provider claims unless independently confirmed.
Evidence
- Source 1 · tulips-greenairports.eu ↗Published: Januar 2025
- Source 2 · independence must be assessed separately · heijmans.nl ↗Berichtsjahr 2025; Publikation 2026, Tag offen
Complete research dossier
The complete editorial record — including the case-specific mechanism, chronology, limitations and cross-references — is maintained in German. Use the DE switch to open the exact counterpart.
Mechanism and limits
Project managers list surplus assets or reserve available materials, while Heijmans carries out physical release and reuse. Product passports and tags connect the inventory record to the object.
TULIPS and Heijmans are project-connected sources. Reservation is distinct from completed installation; quantities, carbon benefits, profitability and broad deployment are not independently established.
Dates and evidence scope
- Recorded event / reference date
- 2024 (Pilotbeginn als Jahr berichtet; Primärbericht Januar 2025)
- Atlas first publication
- 2026-11-14
- Source review in this audit
- 2026-11-14
The editorial update date is not a claim that every source or current product feature was rechecked. Unknown dates remain open. Source publication dates are listed with the evidence above.
Structured evidence and geography register · Unclassified source roles and unassigned origin/market fields are explicitly marked.